Site. Stage. Date.
Send a plan or photo if you have one. If the date has moved, say when it is now needed.
The Slab Signal / South-east Melbourne
When the pour date moves, the whole programme feels it. CoWest gives builders a fast, clear path for termite protection before it becomes an emergency.
Send site + stage + date ↘Just the three things a supervisor needs to protect the next slab: the site, the stage and the date. CoWest handles the pre-construction termite detail, then gives you a record for the project file.
Three moves. No noise.
Send a plan or photo if you have one. If the date has moved, say when it is now needed.
CoWest checks the job brief, confirms what needs to be ready and gives a practical next step.
Installation photos and project documentation are prepared for your handover file.
CoWest on site
Real pre-construction work, photographed at the point it matters: service penetrations, slab stage and the completed perimeter.
Penetrations protected before concrete.
Details checked at the slab stage.
Perimeter work recorded for handover.
The Pour Signal
We do not need an essay. Give us the job basics and CoWest will respond with the next practical step.
Need the technical detail?
We will match scope to the approved drawings, specified system, site conditions and relevant project requirements.
Download Pour-Date Pack ↘Send the current site, stage, clear photo if useful and the needed-by time. CoWest will confirm availability and the practical next step. Urgent attendance depends on location, access and the current programme.
Yes. The precise scope depends on drawings, the selected system and the construction stage. Part A commonly addresses slab-stage details; Part B commonly addresses accessible perimeter, edge and transition details.
Yes. CoWest uses photo-backed Formitize records, with termite documentation, certificates and durable-notice support as required for the project.